Tier 1

Tier 2

Tier 3

Resulting information

Floodplain “at risk” on catchment scale

Floodmap for floodplain downstream of observation. (accuracy depends largely on bankful estimate and model accuracy)

Urban floodmap with estimate of uncertainty in flood extent.

Accuracy depends on exact observations locations and DTM, but estimate of uncertainty given.

Other data requirements

DEM with ~500m resolution  (e.g. hydrosheds; available from 56 degree South and  60 degrees  north)

  • water levels from observation or simulation
  • DEM with <500m resolution  (e.g. hydrosheds / SRTM; available from 56 degree South and  60 degrees  north)
  • High res DTM  ~25m (free availability depends on the country)

Topographical area of applicability

  • fluvial floods (based on HAND)
  • Based on the event location(s) we can include downstream cities but not exclude upstream cities
  • not if terrain too flat (define slope)
  • fluvial floods for larger rivers (based river water levels)
  • pluvial, fluvial and coastal floods

Preparation

  • Deriving global HAND contours
  • Setting up a hydrological model or harvesting water level measurements
  • prepare downstream floodplain domain
  • Preparing DTM
  • for deterministic maps: pre-calculate DTM uncertainty

Run time

  • seconds for cropping of pre-calculated hand contour maps to downstream cells from location
  • seconds for selection of most appropriate contour may take time
  • seconds for determining bankful capacity map
  • minutes for running FloodMapper tool

Depends on extent of domain:

  • minutes deterministic floodmap
  • hours for probabilistic floodmap
  • No labels