Results of benchmark 3-1 for case C
The determination of the reliability index for the Detailed check is not possible using the spreadsheet because the formula implemented in the spreadsheet applies only for horizontal foreland, which is not the case here.
| Benchmark | D-FLOW SLIDE | Relative error |
---|---|---|---|
Marge | 31.514 | 31.514 | 0.00 % |
Slope [1:xxx] | 15 | 15 | 0.00 % |
Assessment level | -10.775 | -10.775 | 0.00 % |
Step 1: Is liquefaction damaging on basis of geometry? | Yes | Yes | OK |
Step 3: Artificially underwater installed and non-compacted sandy foreshore? | No | No | OK |
Result of the Global check | Fail | Fail | OK |
Fictive channel depth Hr [m] | 17.762 | 17.762 | 0.00 % |
Fictive slope cotan αr | 10.5 | 10.5 | 0.00 % |
Probability of preventing a liquefaction P(ZV) [/km/year] | 3.29 × 10-7 | 3.29 × 10-7 | 0.00 % |
Reliability index β | Not available | 3.749 | |
P(L > Lallowable) | Not available | 8.88 × 10-5 | |
Probability of flood damage by liquefaction P(falen|ZV) [/year] | Not available | 1.10 × 10-10 | |
Allowable probability of failure [/year] | 2.50 × 10-6 | 2.50 × 10-6 | 0.00 % |
Result of the Detailed check | Not available | Pass | - |
Overall result | Not available | Pass | - |
...