| Benchmark | D-FLOW SLIDE | Relative error |
---|---|---|---|
Step 1a: Would flow slide lead to damage on levee? Marge [m] Slope [1:xxx] Assessment level [m + NAP] |
Yes 25.352 15.000 -10.775 |
Yes 25.352 15.000 -10.775 |
OK 0.00 % 0.00 % 0.00 % |
Step 1c: Artificially underwater installed and non-compacted sandy foreshore? | No | No | OK |
Step 1d: Flow slide possible based on criteria "steepest slope aver 5m" ? Average slope over a height of at least 5 m [1:xxx] |
No 7.099 |
No 7.100 |
OK 0.01 % |
Step 1e: Flow slide possible based on average geometry only? Total inclination of the channel slope [1:xxx] Is breaching possible? |
No 7.100 No |
No 7.100 No |
OK 0.00 % OK |
Result of the Global check | Pass | Pass | OK |
Fictive channel depth Hr [m] | 25.874 | 25.874 | 0.00 % |
Fictive slope cotan αr | 6.641 | 6.641 | 0.00 % |
Max. allowable retrogression length Lallowable [m] | 60 | 60 | 0.00 % |
Probability of preventing a liquefaction P(ZV) [/km/year] | 2.65 × 10-7 | 2.65 × 10-7 | 0.00 % |
Reliability index β | - | 0.974 | - |
P(L > Lallowable) | 1.65 × 10-1 | 1.65 × 10-1 | 0.00 % |
Probability of flood damage by liquefaction P(falen|ZV) [/year] | 4.38 × 10-8 | 4.38 × 10-8 | 0.00 % |
Allowable probability of failure [/year] | 2.50 × 10-6 | 2.50 × 10-6 | 0.00 % |
Result of the Detailed check | Pass | Pass | OK |
Overall result | Pass | Pass | OK |
Results of benchmark 3-1 for case H:
| Benchmark | D-FLOW SLIDE | Relative error |
---|---|---|---|
Step 1a: Would flow slide lead to damage on levee? Marge [m] Slope [1:xxx] Assessment level [m + NAP] |
Yes 25.352 15.000 -10.775 |
Yes 25.352 15.000 -10.775 |
OK 0.00 % 0.00 % 0.00 % |
Step 1c: Artificially underwater installed and non-compacted sandy foreshore? | No | No | OK |
Step 1d: Flow slide possible based on criteria "steepest slope aver 5m" ? Average slope over a height of at least 5 m [1:xxx] |
No 7.099 |
No 7.100 |
OK 0.01 % |
Step 1e: Flow slide possible based on average geometry only? Total inclination of the channel slope [1:xxx] Is breaching possible? |
No 7.100 No |
No 7.100 No |
OK 0.00 % OK |
Result of the Global check | Pass | Pass | OK |
Fictive channel depth Hr [m] | 25.874 | 25.874 | 0.00 % |
Fictive slope cotan αr | 6.641 | 6.641 | 0.00 % |
Max. allowable retrogression length Lallowable [m] | 60 | 60 | 0.00 % |
Probability of preventing a liquefaction P(ZV) [/km/year] | 6.66 × 10-4 | 6.66 × 10-4 | 0.00 % |
Reliability index β | - | 0.974 | - |
P(L > Lallowable) | 1.65 × 10-1 | 1.65 × 10-1 | 0.00 % |
Probability of flood damage by liquefaction P(falen|ZV) [/year] | 1.10 × 10-4 | 1.10 × 10-4 | 0.00 % |
Allowable probability of failure [/year] | 2.50 × 10-7 | 2.50 × 10-7 | 0.00 % |
Result of the Detailed check | Fail | Fail | OK |
Overall result | Warning | Warning | OK |