Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

By combining the latest technological developments in the field of ICT, hydrological models, crop models and satellites, it is possible to develop a real-time forecasting system for crop production, enabling water boards, farmers and the insurance broker to improve their services and possibly reduce costs. .

Therefore, a joint project proposal is made by Achmea (Agro), Deltares and the water boards Aa en Maas and Vechtstromen. 

...

The project is divided in two stages. In phase 1 we will develop in close calibration with the waterboards, Achmea and the farmers the forecasting system for crop production that will feed the developed app by Milan SAF. Also experience from WageningenEnvrionmentalResearch  inc ropmodellingWageningen Envrionmenta lResearch  in cropmodelling(WOFOST) will be involved. In phase 2 we will calibrate the models and do data assimilation with available soil moisture and groundwater level measurements retrieved from satellite data to improve the results of the model. The following steps describe the activities to fulfill the project’s objectives.

Phase 1: Setup the operational system and develop the farmers app (~170K Euro ex BTW)app 

  1. Deltares in collaboration with the waterboards and Achmea will select the most suitable pilot areas with preferably a dense monitoring network of groundwater levels and soil moisture
  2. A workshop with farmers will be organised by Deltares, Achmea, waterboardsandMilanto to refine the app to farmers’ needs.
  3. Deltares will clip the regional MODFLOW-METASWAP-WOFOST model for the selected pilot area and run the models and check if the results make sense.
  4. Deltares will integrate the models in a FEWS system for real-time forecasting. Delft-FEWS consists of a sophisticated set of configurable modules for building a hydrological forecasting system customised to the specific requirements of an individual organisation. https://www.deltares.nl/app/uploads/2015/01/Delft-FEWS_brochure-2017.pdf
  5. The relevant WOFOST output from FEWSsystemsuch as potential production and water-limited production will be exported to Milan and to the water boards. This activity will be done in collaboration with the water boards and Milan
  6. Milan SAF will develop the farmers’ app with as input the exported data from FEWS.

Phase 2: Improve the model results by: (Budget: ~45K Ex BTW)

  1. Data assimilation with available soil moisture satellite data and groundwater level measurements. This activity will be performed by Deltares in close collaboration with the water boards that have the expert knowledge and satellite data. Also Wageningen Environmental research will be involved by Deltares (contract Deltares-WUR) to incorporate their knowledge on crop modelling.
  2. Calibrate the model with historical crop damage data from the farmers and ground measurements and with available historical satellite data. This activity will be performed by Deltares in close collaboration with the waterboards andAchmeaand Achmea,since  since all parties have expert knowledge and data in this area.
  3. Evaluate the app with the farmers, the water boards, Achmea and Milan SAF.
  4. The project team will provide a final version of the app based on evaluation and the newly calibrated model.

The table below shows all activities of phase 1 and 2 coupled to the organization(s) that will perform the activity.

 

Table of Contents

Phase 1 Activities

...

Who?

...

1. Select pilot

...

Deltares/Water boards/Achmea

...

2. Workshop with farmers about the app

...

Deltares/Water boards/Achmea/Milan

...

3. Clip and run/check the models

...

Deltares

...

4. FEWS system

...

Deltares

...

5. Export data from FEWS to app & water board

...

Deltares/Milan/water board

...

6. Develop the app

...

Milan

...

Phase 2 Activities

...

Who?

...

7. Data assimilation with available satellite data

...

Deltares/Water boards

...

8. Calibrate the model with historical crop damage data an ground measurements

...

Deltares/Waterboards/Achmea

...

9. Evaluation with farmers about the app

...

Deltares/Waterboards/farmers/Achmea/Milan/WUR

...

.

...

...

Deltares/Waterboards/

Achmea/Milan

Deliverables

The deliverables include:

...

-          Organizing 2 workshops with farmers, Achmea and waterboards:

    • 1 workshop: output will be a list of requirements for the app from the farmers
    • 1 workshop :output will be an evaluation of the farmers app

-          Report:

    • Description of the setup of the operational system
    • Description of the applied models (MODFLOW, MetaSWAP and WOFOST)
    • Description of the calibration and verification of the models
    • Descriptions of the outputs of the workshops
    • Conclusions and recommendations 

 

 

 

 

 --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Partners/ organisations involved

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Image resultImage result for waterschap aa en maasRelated image

Partners/organisations  organisations involved: Deltares, Achmea, Milan Innovincy B.V, waterschap Aa en Maas en waterschap Vechtstromen 

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Results

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

 

 

 

 

 

 

 

 

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Internal communication

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Contacts project team: contact projectteam.xlsx

...