Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migration of unmigrated content due to installation of a new plugin

...

The

...

first

...

step

...

in

...

scenario

...

building

...

Define

...

basic

...

risk

...

management

...

scenarios

...

In

...

the

...

previous

...

steps

...

("Starting

...

IMS"

...

and

...

"Risk

...

Assessment")

...

risks

...

were

...

assessed,

...

and

...

risk

...

reduction

...

objectives

...

and

...

targets

...

were

...

identified.

...

Now

...

the

...

development

...

and

...

selection

...

of

...

risk

...

management

...

scenarios

...

is

...

worked

...

out.

...



First,

...

technically

...

feasible

...

measures

...

to

...

achieve

...

the

...

risk

...

reduction

...

objectives

...

are

...

identified.

...

 

Second,

...

several

...

basic

...

scenarios

...

are

...

composed.

...



"A

...

basic

...

scenario

...

consists

...

of

...

a

...

set

...

of

...

technically

...

feasible

...

risk

...

reduction

...

measures

...

that

...

could

...

be

...

implemented

...

at

...

the

...

sources,

...

the

...

pathways

...

or

...

the

...

receptors,

...

or

...

a

...

combination

...

of

...

measures

...

along

...

this

...

sequence.

...

The

...

risk-reduction

...

results

...

for

...

each

...

basic

...

scenario

...

need

...

to

...

be

...

estimated,

...

and

...

compared

...

with

...

the

...

risk

...

reduction

...

objectives

...

and

...

targets

...

to

...

be

...

achieved.

...

In

...

this

...

way

...

the

...

system

...

response

...

to

...

risk

...

reduction

...

measures

...

becomes

...

clear,

...

and

...

a

...

discussion

...

with

...

stakeholders

...

on

...

acceptable

...

risk

...

management

...

scenarios

...

can

...

be

...

started."

...



The purpose of making basic scenarios is twofold: testing the risk reduction response (in time and space) of risk reduction measures at the level of risk clusters and the megasite, and constituting a basis for initial discussion with the group of stakeholders GOS on management scenarios. As a result of this discussion, a selection of acceptable basic scenarios is determined, which are to be used in further scenario development.

Image Added

The mentioned aspects are addressed in details as follows:

  1. Technologies to be included in scenarios
  2. General criteria for scenarios built-up
  3. Building up basic scenarios
  4. Checking and updating risk reduction objectives, targets and boundary conditions
  5. Selection of acceptable basic scenarios
Output

According to the risk assessment, the basic risk management scenarios are determined based on technically feasible risk reduction measures and technologies. As a result of GOS discussion, acceptable basic scenarios are selected.