Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Calculation results of the urban water balance model indicate that measures change the return periods of runoff volumes by a constant factor. Figure 1 shows the calculation results of several measures applied in an area in Laakhaven (The Hague, The Netherlands). Continuing the example above, where a runoff return period of 2 years is changed into a runoff period of 3 years after applying a measure, the same measure will change a runoff with a return period of 20 years into a runoff with a return period of 30 years and a return period of 0.2 years will change into a return period of 0.3 years. The latter is very interesting, because that means that the effectivity of measures can be tested (in practice) during short periods of time.

Image RemovedImage Removed
Image RemovedImage Removed
Image RemovedImage Removed

...

 

 

 

Image AddedImage Added
Image AddedImage Added
Image AddedImage Added

Figure 1   Calculation Simulation results of the effect of applied measures on the return periods of urban runoff volumes for Laakhaven over a 30-year period with an hourly calculation time step

...