89212.21 DelftShell

26.08.2008   02:38                                                             PROJEKTADMINISTRATIE                                                wb0202                  PAG.    1
                                                   K U M U L A T I E V E   K O S T E N K A A R T   I N T E R N   P R O J E K T
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BEDRIJF:   1  Deltares RW                                                                                                                                    (bedragen in euro's)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   SEKTOR       : Delft Hydraulics Software                                                                                                 Periode : 2008.01 t/m 2008.09  VOORLOPIG
	
   Projekt      : 89212.21 Delft Shell
   Projektleider: 10252 BAART F                                                                                                                      Status         : Open
   Kostenplaats : 9706 DHS: Development
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   OMSCHRIJVING                                  EENHEDEN       KOSTPRIJS                 PER-01 PER-02 PER-03 PER-04 PER-05 PER-06 PER-07 PER-08 PER-09 PER-10 PER-11 PER-12 PER-13
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   10545 BERG P.A.M. VAN DEN                                                                                                 318,0         318,0-
   11895 DONCHYTS G.V.                              42,0        4.284,00                                                     213,0         171,0-
   12352 EYKELHOFF H.A.J.                           16,0        1.136,00                                                                    16,0
   13877 JAGERS H.R.A.                               4,0          520,00                                                                     4,0
                                                  ------- ---------------
   (9710) Delft Hydraulics Software                 62,0        5.940,00
	
                                                 -------- ---------------
   *TOTAAL PERSONEELSKOSTEN*                        62,0        5.940,00
	
	
   Totaal deelprojekt periode: 2008.01 t/m 2008.09              5.940,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BUDGETBEWAKING PERIODE 2008.01 T/M 2008.09
   	
                    -------KUMULATIEF-------   ----------------BUDGETGEGEVENS----------------
   OMSCHRIJVING     EENHEDEN       KOSTPRIJS         VERSCHIL      KUM.BUDGET      JAARBUDGET
   	
   PERSONEEL            62,0       5.940,00         5.940,00-
   FACILITEITEN
   OVERIGE KOSTEN
   MATERIAAL
                             ---------------  --------------- --------------- ---------------
   TOTAAL                          5.940,00         5.940,00-
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

89212.22 Map Control

26.08.2008   02:38                                                             PROJEKTADMINISTRATIE                                                wb0202                  PAG.    1
                                                   K U M U L A T I E V E   K O S T E N K A A R T   I N T E R N   P R O J E K T
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BEDRIJF:   1  Deltares RW                                                                                                                                    (bedragen in euro's)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   SEKTOR       : Delft Hydraulics Software                                                                                                 Periode : 2008.01 t/m 2008.09  VOORLOPIG
	
   Projekt      : 89212.22 Map Control
   Projektleider: 11895 DONCHYTS G.V.                                                                                                                Status         : Open
   Kostenplaats : 9706 DHS: Development
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   OMSCHRIJVING                                  EENHEDEN       KOSTPRIJS                 PER-01 PER-02 PER-03 PER-04 PER-05 PER-06 PER-07 PER-08 PER-09 PER-10 PER-11 PER-12 PER-13
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   11895 DONCHYTS G.V.                              76,0        7.752,00                                                      36,0   16,0   24,0
   12352 EYKELHOFF H.A.J.                          137,5        9.762,50                                                      72,0   57,5    8,0
   25264 LOGCHEM O.A. VAN                           34,0        3.468,00                                                      34,0
                                                  ------- ---------------
   (9710) Delft Hydraulics Software                247,5       20.982,50
	
                                                 -------- ---------------
   *TOTAAL PERSONEELSKOSTEN*                       247,5       20.982,50
	
	
   Totaal deelprojekt periode: 2008.01 t/m 2008.09             20.982,50
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BUDGETBEWAKING PERIODE 2008.01 T/M 2008.09
   	
                    -------KUMULATIEF-------   ----------------BUDGETGEGEVENS----------------
   OMSCHRIJVING     EENHEDEN       KOSTPRIJS         VERSCHIL      KUM.BUDGET      JAARBUDGET
   	
   PERSONEEL           247,5      20.982,50        20.982,50-
   FACILITEITEN
   OVERIGE KOSTEN
   MATERIAAL                                       13.846,15       13.846,15       20.000,00
                             ---------------  --------------- --------------- ---------------
   TOTAAL                         20.982,50         7.136,35-      13.846,15       20.000,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

89212.23 Schematisatie Editor

26.08.2008   02:38                                                             PROJEKTADMINISTRATIE                                                wb0202                  PAG.    1
                                                   K U M U L A T I E V E   K O S T E N K A A R T   I N T E R N   P R O J E K T
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BEDRIJF:   1  Deltares RW                                                                                                                                    (bedragen in euro's)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   SEKTOR       : Delft Hydraulics Software                                                                                                 Periode : 2008.01 t/m 2008.09  VOORLOPIG
	
   Projekt      : 89212.23 Schematisatie Editor
   Projektleider: 11895 DONCHYTS G.V.                                                                                                                Status         : Open
   Kostenplaats : 9706 DHS: Development
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   OMSCHRIJVING                                  EENHEDEN       KOSTPRIJS                 PER-01 PER-02 PER-03 PER-04 PER-05 PER-06 PER-07 PER-08 PER-09 PER-10 PER-11 PER-12 PER-13
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   14699 KOSTER A.                                  92,0        7.360,00                                                             16,0   60,0   16,0
                                                  ------- ---------------
   (9450) Verkenningen en Beleidsanalyse            92,0        7.360,00
	
   10252 BAART F                                    31,0        3.162,00                                                       4,0   27,0
   10545 BERG P.A.M. VAN DEN                       228,5       19.651,00                                                      53,0   59,5   84,0   32,0
   11895 DONCHYTS G.V.                              76,0        7.752,00                                                      44,0   24,0    8,0
   12352 EYKELHOFF H.A.J.                           72,0        5.112,00                                                             40,0   32,0
   25264 LOGCHEM O.A. VAN                          156,0       15.912,00                                                            119,0   31,0    6,0
                                                  ------- ---------------
   (9710) Delft Hydraulics Software                563,5       51.589,00
	
                                                 -------- ---------------
   *TOTAAL PERSONEELSKOSTEN*                       655,5       58.949,00
	
	
   Totaal deelprojekt periode: 2008.01 t/m 2008.09             58.949,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BUDGETBEWAKING PERIODE 2008.01 T/M 2008.09
   	
                    -------KUMULATIEF-------   ----------------BUDGETGEGEVENS----------------
   OMSCHRIJVING     EENHEDEN       KOSTPRIJS         VERSCHIL      KUM.BUDGET      JAARBUDGET
   	
   PERSONEEL           655,5      58.949,00        17.410,54-      41.538,46       60.000,00
   FACILITEITEN
   OVERIGE KOSTEN
   MATERIAAL
                             ---------------  --------------- --------------- ---------------
   TOTAAL                         58.949,00        17.410,54-      41.538,46       60.000,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

89212.24 Filestandaarden

26.08.2008   02:38                                                             PROJEKTADMINISTRATIE                                                wb0202                  PAG.    1
                                                   K U M U L A T I E V E   K O S T E N K A A R T   I N T E R N   P R O J E K T
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BEDRIJF:   1  Deltares RW                                                                                                                                    (bedragen in euro's)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   SEKTOR       : Delft Hydraulics Software                                                                                                 Periode : 2008.01 t/m 2008.09  VOORLOPIG
	
   Projekt      : 89212.24 Filestandaarden
   Projektleider: 10252 BAART F                                                                                                                      Status         : Open
   Kostenplaats : 9706 DHS: Development
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   OMSCHRIJVING                                  EENHEDEN       KOSTPRIJS                 PER-01 PER-02 PER-03 PER-04 PER-05 PER-06 PER-07 PER-08 PER-09 PER-10 PER-11 PER-12 PER-13
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   13775 HUMMEL S.                                   2,0          260,00                                                       2,0
                                                  ------- ---------------
   (9012) Speurwerk & Ontwikkeling                   2,0          260,00
	
   12093 DIJK M.J. VAN                               1,0          130,00                                                       1,0
   19397 WERNER M.G.F.                               1,0          130,00                                                       1,0
                                                  ------- ---------------
   (9400) Zoetwatersytemen                           2,0          260,00
	
   10252 BAART F                                    56,0        5.712,00                                                     201,0   36,0  181,0-
   11895 DONCHYTS G.V.                             121,0       12.342,00                                                      97,0          24,0
   13877 JAGERS H.R.A.                              43,0        5.590,00                                                      43,0
   14273 KEPPEL J.F.                                39,0        3.354,00                                                                    12,0   27,0
   15445 MARKUS A.A.                                 1,0          102,00                                                              1,0
   15804 MOOIMAN J.                                 16,0        1.632,00                                                       7,0    9,0
   16384 OVERMARS J.F.M.                             1,5          153,00                                                              1,5
   16565 PLATZEK F.W.                               15,0        1.290,00                                                      15,0
                                                  ------- ---------------
   (9710) Delft Hydraulics Software                292,5       30.175,00
	
                                                 -------- ---------------
   *TOTAAL PERSONEELSKOSTEN*                       296,5       30.695,00
	
	
   Totaal deelprojekt periode: 2008.01 t/m 2008.09             30.695,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BUDGETBEWAKING PERIODE 2008.01 T/M 2008.09
   	
                    -------KUMULATIEF-------   ----------------BUDGETGEGEVENS----------------
   OMSCHRIJVING     EENHEDEN       KOSTPRIJS         VERSCHIL      KUM.BUDGET      JAARBUDGET
   	
   PERSONEEL           296,5      30.695,00        30.695,00-
   FACILITEITEN
   OVERIGE KOSTEN
   MATERIAAL
                             ---------------  --------------- --------------- ---------------
   TOTAAL                         30.695,00        30.695,00-
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

89212.25 Data Editors

26.08.2008   02:38                                                             PROJEKTADMINISTRATIE                                                wb0202                  PAG.    1
                                                   K U M U L A T I E V E   K O S T E N K A A R T   I N T E R N   P R O J E K T
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BEDRIJF:   1  Deltares RW                                                                                                                                    (bedragen in euro's)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   SEKTOR       : Delft Hydraulics Software                                                                                                 Periode : 2008.01 t/m 2008.09  VOORLOPIG
	
   Projekt      : 89212.25 Data Editors
   Projektleider: 11895 DONCHYTS G.V.                                                                                                                Status         : Open
   Kostenplaats : 9706 DHS: Development
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   OMSCHRIJVING                                  EENHEDEN       KOSTPRIJS                 PER-01 PER-02 PER-03 PER-04 PER-05 PER-06 PER-07 PER-08 PER-09 PER-10 PER-11 PER-12 PER-13
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   10085 AKKER O. VAN DEN                            1,0          102,00                                                       1,0
   10137 ALWAN S.F.                                295,0       25.370,00                                                     205,0   50,0   40,0
   10252 BAART F                                    29,0        2.958,00                                                      19,0    8,0    2,0
   11895 DONCHYTS G.V.                              66,0        6.732,00                                                       6,0   24,0   36,0
   25264 LOGCHEM O.A. VAN                           61,0        6.222,00                                                                    38,0   23,0
                                                  ------- ---------------
   (9710) Delft Hydraulics Software                452,0       41.384,00
	
                                                 -------- ---------------
   *TOTAAL PERSONEELSKOSTEN*                       452,0       41.384,00
	
   07 (9065) 4612 S080716 VerhuurWL6901                            40,00
                                                 -------- ---------------
   *TOTAAL OVERIGE KOSTEN*                                         40,00
	
	
   Totaal deelprojekt periode: 2008.01 t/m 2008.09             41.424,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BUDGETBEWAKING PERIODE 2008.01 T/M 2008.09
   	
                    -------KUMULATIEF-------   ----------------BUDGETGEGEVENS----------------
   OMSCHRIJVING     EENHEDEN       KOSTPRIJS         VERSCHIL      KUM.BUDGET      JAARBUDGET
   	
   PERSONEEL           452,0      41.384,00           154,46       41.538,46       60.000,00
   FACILITEITEN
   OVERIGE KOSTEN                     40,00            40,00-
   MATERIAAL
                             ---------------  --------------- --------------- ---------------
   TOTAAL                         41.424,00           114,46       41.538,46       60.000,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

89212.26 Integratie

26.08.2008   02:38                                                             PROJEKTADMINISTRATIE                                                wb0202                  PAG.    1
                                                   K U M U L A T I E V E   K O S T E N K A A R T   I N T E R N   P R O J E K T
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BEDRIJF:   1  Deltares RW                                                                                                                                    (bedragen in euro's)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   SEKTOR       : Delft Hydraulics Software                                                                                                 Periode : 2008.01 t/m 2008.09  VOORLOPIG
	
   Projekt      : 89212.26 Integratie
   Projektleider: 10252 BAART F                                                                                                                      Status         : Open
   Kostenplaats : 9706 DHS: Development
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   OMSCHRIJVING                                  EENHEDEN       KOSTPRIJS                 PER-01 PER-02 PER-03 PER-04 PER-05 PER-06 PER-07 PER-08 PER-09 PER-10 PER-11 PER-12 PER-13
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   18764 VERHOEVEN G.F.                              2,5          215,00                                                       2,5
   18818 VERSCHELLING E.                             3,0          306,00                                                                     3,0
                                                  ------- ---------------
   (9400) Zoetwatersytemen                           5,5          521,00
	
   10252 BAART F                                   100,0       10.200,00                                                      43,0          42,0   15,0
   11895 DONCHYTS G.V.                              26,0        2.652,00                                                             10,0   16,0
   16091 NOORT J.J.                                172,0       14.792,00                                                      69,0   50,0   53,0
   25264 LOGCHEM O.A. VAN                           52,5        5.355,00                                                      52,5
                                                  ------- ---------------
   (9710) Delft Hydraulics Software                350,5       32.999,00
	
                                                 -------- ---------------
   *TOTAAL PERSONEELSKOSTEN*                       356,0       33.520,00
	
   07 (9065) 4612 S080716 VerhuurWL6902                            40,00
                                                 -------- ---------------
   *TOTAAL OVERIGE KOSTEN*                                         40,00
	
	
   Totaal deelprojekt periode: 2008.01 t/m 2008.09             33.560,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BUDGETBEWAKING PERIODE 2008.01 T/M 2008.09
   	
                    -------KUMULATIEF-------   ----------------BUDGETGEGEVENS----------------
   OMSCHRIJVING     EENHEDEN       KOSTPRIJS         VERSCHIL      KUM.BUDGET      JAARBUDGET
   	
   PERSONEEL           356,0      33.520,00        33.520,00-
   FACILITEITEN
   OVERIGE KOSTEN                     40,00            40,00-
   MATERIAAL                                       90.000,00       90.000,00      130.000,00
                             ---------------  --------------- --------------- ---------------
   TOTAAL                         33.560,00        56.440,00       90.000,00      130.000,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

89212.27 Data visualisatie

26.08.2008   02:38                                                             PROJEKTADMINISTRATIE                                                wb0202                  PAG.    1
                                                   K U M U L A T I E V E   K O S T E N K A A R T   I N T E R N   P R O J E K T
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BEDRIJF:   1  Deltares RW                                                                                                                                    (bedragen in euro's)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   SEKTOR       : Delft Hydraulics Software                                                                                                 Periode : 2008.01 t/m 2008.09  VOORLOPIG
	
   Projekt      : 89212.27 Data visualisatie
   Projektleider: 11895 DONCHYTS G.V.                                                                                                                Status         : Open
   Kostenplaats : 9706 DHS: Development
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   OMSCHRIJVING                                  EENHEDEN       KOSTPRIJS                 PER-01 PER-02 PER-03 PER-04 PER-05 PER-06 PER-07 PER-08 PER-09 PER-10 PER-11 PER-12 PER-13
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   11895 DONCHYTS G.V.                              25,0        2.550,00                                                              8,0   17,0
                                                  ------- ---------------
   (9710) Delft Hydraulics Software                 25,0        2.550,00
	
                                                 -------- ---------------
   *TOTAAL PERSONEELSKOSTEN*                        25,0        2.550,00
	
	
   Totaal deelprojekt periode: 2008.01 t/m 2008.09              2.550,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BUDGETBEWAKING PERIODE 2008.01 T/M 2008.09
   	
                    -------KUMULATIEF-------   ----------------BUDGETGEGEVENS----------------
   OMSCHRIJVING     EENHEDEN       KOSTPRIJS         VERSCHIL      KUM.BUDGET      JAARBUDGET
   	
   PERSONEEL            25,0       2.550,00        23.010,00       25.560,00       36.920,00
   FACILITEITEN
   OVERIGE KOSTEN
   MATERIAAL                                        2.132,31        2.132,31        3.080,00
                             ---------------  --------------- --------------- ---------------
   TOTAAL                          2.550,00        25.142,31       27.692,31       40.000,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

89212.28 Model Communicatie

26.08.2008   02:38                                                             PROJEKTADMINISTRATIE                                                wb0202                  PAG.    1
                                                   K U M U L A T I E V E   K O S T E N K A A R T   I N T E R N   P R O J E K T
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BEDRIJF:   1  Deltares RW                                                                                                                                    (bedragen in euro's)
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   SEKTOR       : Delft Hydraulics Software                                                                                                 Periode : 2008.01 t/m 2008.09  VOORLOPIG
	
   Projekt      : 89212.28 Model communicatie
   Projektleider: 10252 BAART F                                                                                                                      Status         : Open
   Kostenplaats : 9706 DHS: Development
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   OMSCHRIJVING                                  EENHEDEN       KOSTPRIJS                 PER-01 PER-02 PER-03 PER-04 PER-05 PER-06 PER-07 PER-08 PER-09 PER-10 PER-11 PER-12 PER-13
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   10252 BAART F                                    53,0        5.406,00                                                      37,0   16,0
   11895 DONCHYTS G.V.                              62,0        6.324,00                                                      22,0   32,0    8,0
   13877 JAGERS H.R.A.                              11,0        1.430,00                                                      11,0
   16091 NOORT J.J.                                  6,0          516,00                                                       6,0
                                                  ------- ---------------
   (9710) Delft Hydraulics Software                132,0       13.676,00
	
                                                 -------- ---------------
   *TOTAAL PERSONEELSKOSTEN*                       132,0       13.676,00
	
	
   Totaal deelprojekt periode: 2008.01 t/m 2008.09             13.676,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
   BUDGETBEWAKING PERIODE 2008.01 T/M 2008.09
   	
                    -------KUMULATIEF-------   ----------------BUDGETGEGEVENS----------------
   OMSCHRIJVING     EENHEDEN       KOSTPRIJS         VERSCHIL      KUM.BUDGET      JAARBUDGET
   	
   PERSONEEL           132,0      13.676,00        13.676,00-
   FACILITEITEN
   OVERIGE KOSTEN
   MATERIAAL                                       65.769,23       65.769,23       95.000,00
                             ---------------  --------------- --------------- ---------------
   TOTAAL                         13.676,00        52.093,23       65.769,23       95.000,00
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------