Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

For case C, the same input as benchmark 1-1 (see group 1) is used except for xxx: xxxthe position of the characteristic point "Insert river channel" which is lowered to get a slope channel of 1 : 7,1.

For case D, the same input as benchmark 1-1 (see group 1) is used.

...

Results of benchmark 3-1 for case B

The overall result is not correctly determined in D-Flow Slide if the foreshore is artificial: D-Flow Slide uses the Detailed check result but it should directly conclude that the Overall check fails. 

 

Benchmark

D-FLOW SLIDE

Relative error

Marge

35

35

0.00

Slope [1:xxx]1515 0.00 

Assessment level

-10

-10

0.00

Step 1: Is liquefaction damaging on basis of geometry?

Yes

Yes

OK

Step 3: Artificially underwater installed and non-compacted sandy foreshore?

Yes

Yes

OK

Result of the Global check

Fail

Fail

OK

Fictive channel depth Hr [m]21.57121.5710.00 %
Fictive slope cotan αr10.510.50.00 % 
Probability of preventing a liquefaction P(ZV) [/km/year] 1.24 × 10-61.24 × 10-60.00 %
Reliability index β 3.7493.7490.00 % 
P(L > Lallowable)8.86 × 10-58.88 × 10-50.23 %
Probability of flood damage by liquefaction P(falen|ZV) [/year]1.10 × 10-10 1.10 × 10-100.00 %
Allowable probability of failure [/year]2.50 × 10-6 2.50 × 10-60.00 %

Result of the Detailed check 

PassPassOK 
Overall resultPassFailnot OK 

...