This benchmark tests all possible trajectories according to the Global check . Those trajectories are:and all possible combinations between the Global and the Detailed checks:
Case | Step 1 | Step 3 | Step 4 | Step 5 | Step 6 | Step 7 | Global check | Detailed check | Overall result |
---|---|---|---|---|---|---|---|---|---|
A | No | Pass | Pass | Pass | |||||
B | Yes | Yes | Fail | Pass | Fail | ||||
C | Yes | No | No | Pass | |||||
D | Yes | No | Yes | Yes | Fail | Pass | Pass | ||
E | Yes | No | Yes | No | Yes | Fail | Pass | Pass | |
F | Yes | No | Yes | No | No | Yes | Fail | Fail | Fail |
G | Yes | No | Yes | No | No | No | Pass | Fail | Warning message |
...
For case A, the same input as benchmark 1-1 (see group 1) is used except for the surface line: the length of the foreland is increased to 160 m (instead of 60 m).
For case B, the same input as benchmark 1-1 (see group 1) is used except for the foreland: an artificial instead of a natural foreland is assumed.
For case C, the same input as benchmark 1-1 (see group 1) is used except for the position of the characteristic point "Insert river channel" which is lowered to get a slope channel of 1 : 7,1.
For case D, the same input as benchmark 1-1 (see group 1) is used.
For case E, the same input as benchmark 1-1 (see group 1) is used except for the state parameter which is equal to -0.06 instead of -0.03.
For case F, the same input as benchmark 1-1 (see group 1) is used except for the state parameter which is equal to -0.06 instead of -0.03, except for the diameters D50 and D15 which are equal to 250 μm and 150 μm resp. for sand layers and except for the channel slope which is 1 : 2 instead of 1 : 6.
For case G, the same input as benchmark 1-1 (see group 1) is used except for the state parameter which is equal to -0.06 instead of -0.03 and except for the diameters D50 and D15 which are equal to 250 μm and 150 μm resp. for sand layers.For the Detailed check, the required probability of failure is 1 per 40000 years instead of 1 per 4000 years and the migration velocity is 0.5m/year instead of 10 mm /year.
...
Results are identical to benchmark 1-1 and can be found in Group 1.
Case E:
Global check - Step 1: Same results as benchmark 1-1 (flow slide would lead to damage on levee) => Go to step 3.
...
See results of benchmark 1-1 in Group 1.
Results of benchmark 3-1 for case E
...