Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

When a modifier is made at a node with a local successfull run then the icon will change to a yellow icon Image Removed icon with a blue check (local run) Image Added or yellow icon with a green check (server run)Image Addedto indicate that the workflow of that node needs to rerun.

...

If the user changes the state selection in the IFD so that the state selection used in the run doesn't match the state selection in the IFD anymore then the icon will turn yellow Image Removedto a yellow icon with a blue check (local run) Image Added or yellow icon with a green check (server run)Image Addedto indicate that the node needs to be rerun.

An example is shown below

...

If a user increases the forecast length the status will also be set to invalid and change to the icon to a yellow icon with a blue check (local run) Image Added or yellow icon with a green check (server run)Image Addedto indicate that the node needs to be rerun.

Previous node has an invalid status

...

In the example below node TUNA2 has a successfull status. When the user reruns the previous node NEBA2 then node TUNA2 also needs to rerun to make sure that its results are up-to-date.

To indicate this the icon of node TUNA2 is is marked as yellowchanged to a yellow icon with a blue check (local run) Image Added.

Time zero different and another item is invalid

...

then the icon will change into a grey icon with a yellow checkmarkcheckmark  (server runs and local runs)Image Added. Below a few examples.

...