Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

 

Image Modified

The various details are described below:

Item

Details

Task ID

An identifier for the Task. Displayed in the header.

Task Status

As described for the main forecast screen Available Actions

As described for the main forecast screen

Description

Text description associated with the task.

Tag

An identifier used for Event/Action mappings (see: Setting Up Event-Action Configuration. Only displayed if set.

Workflow ID

An identifier for the associated Workflow.

What-if Scenario

An identifier for the associated What-if Scenario

Owning MC ID

MC the task belongs to

Start Time

The first forecast run is done at the Start time

End Time

Scheduling of the task stops at the End Time

IntervalRepeat Mode

The time interval at which the scheduled task should run

Shift T0

Allows to define a period of time over which the T0 of the forecast itself should be set back in relation to the Start time of the forecast run.

Forecast Length 
Expiry Time 
Ensemble partitioning 

Task Priority

Tasks can have priority High or Normal.

Failover behaviour

Whether this task should be run on the Failover Master Controller.

Approve

Makes the forecast automatically current after it has been completed. Note that with the default synchProfiles, synchronisation will only download forecast data that are made current (i.e. that are approved) to the OC.

Run Option

Selected Run Option. All, All One At A Time or All Most Recent Only

Task XMLProperties

Link to download a copy of the properties of the tasks in xml format conforming to the taskList.xsd schema
(Also used by the Upload Task(s) from File).