...
Item | Details |
---|---|
Task ID | An identifier for the Task. Displayed in the header. |
Task Status | As described for the main forecast screen |
Description | Text description associated with the task. |
Tag | An identifier used for Event/Action mappings (see: Setting Up Event-Action Configuration. Only displayed if set. |
Workflow | An identifier for the associated Workflow. |
What-if Scenario | An identifier for the associated What-if Scenario |
Owning MC ID | MC the task belongs to |
Start Time | The first forecast run is done at the Start time |
End Time | Scheduling of the task stops at the End Time |
Repeat Mode | The time interval at which the scheduled task should run |
Shift T0 | Allows to define a period of time over which the T0 of the forecast itself should be set back in relation to the Start time of the forecast run. |
Forecast Length | |
Expiry Time | |
Ensemble partitioning | Allows workflows to be split up run in parallel on multiple Forecasting Shells (e.g. for ensembles). This needs the attribute maxEnsembleParts in the Workflowdescriptor to be set to a value > 1. The value entered is the number of parallel parts the task should be split into. |
Task Priority | Tasks can have priority High or Normal. |
Failover | Whether this task should be run on the Failover Master Controller. |
Run Option | Selected Run Option. All, All One At A Time or All Most Recent Only |
Task XML | Link to download a copy of the the tasks in xml conforming to the taskList.xsd schema (Also used by the Upload Task(s) from File). |