Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Step 3 Update IdMapping (has to be done for each scenario!)

The id mapping hast to be updated, therefore you have to populate the worksheets with results from step 4.

  1. Go to the XML-files as generated in step 4.8
  2. For each scenario-type conduct the following steps:
  • copy the individual locations (id, x,y,z) as listed in XXX_GW_abstractions_Locations.xml
  • paste into column H,I,J,K (starting at row 3)
  • copy the parent locations (id, x,y,z) as listed in XXX_GW_abstractions_Locations_MultiLayer.xml
  • paste into column B,C,D,E (starting at row 3)

If you do have an XML-editor which can only copy-paste the table with XML-structure, it might be wise to create a macro in your text editor which converts the table into a comma seperated table which can be loaded into Excel.

  1. comment the shut down activity in the GA run out
  2. run the model
  3. execute the xxx_prepare but in the modules directorycopy
  4. the