...
Step 3 Update IdMapping (has to be done for each scenario!)
The id mapping hast to be updated, therefore you have to populate the worksheets with results from step 4.
- Go to the XML-files as generated in step 4.8
- For each scenario-type conduct the following steps:
- copy the individual locations (id, x,y,z) as listed in XXX_GW_abstractions_Locations.xml
- paste into column H,I,J,K (starting at row 3)
- copy the parent locations (id, x,y,z) as listed in XXX_GW_abstractions_Locations_MultiLayer.xml
- paste into column B,C,D,E (starting at row 3)
If you do have an XML-editor which can only copy-paste the table with XML-structure, it might be wise to create a macro in your text editor which converts the table into a comma seperated table which can be loaded into Excel.
- comment the shut down activity in the GA run out
- run the model
- execute the xxx_prepare but in the modules directorycopy
- the