Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Make sure that the global properties include the following line: USE_CURRENT_SIMULATED_WITH_COLD_STATE_SELECTION=true

Step 2:

...

Check locations in LocationSets.xml

  1. Make sure that the order of the location sets in location set xxx_wells_parents is as follows:
    1)  WMW_wells_normal_parents
    2)  WMW_wells_super_parents
  2. Make sure all locations which refer to super parents are childs or normal parents (no singles!)

Step 3

...

Check IdMapping

  1. comment the shut down activity in the GA run out for all scenarios
  2. run the model
  3. check for each scenario if the id's in WMW_QSRC_GW_TimeSeries_MultiLayer.xml and WMW_QSRC_GW_TimeSeries.xml in the toNGMS modules folder are the same as listed in the idmapping (Config/IdMapFiles), especially check the ordering of layers in the name of the super / normal parents
  4. if the id's are not the same you have to update the id mapping (see also step 4.8 and 5.9), therefore

The id mapping hast to be updated, therefore you have to populate the worksheets with results from step 4.

  1. Go to the XML-files as generated in step 4.8
  2. For each scenario-type conduct the following steps:
    • run the the xxx_prepare.but for each scenario-type in the modules directory
    • populate the location worksheets as follows
    comment the
        1. copy the individual locations (id, x,y,z) as listed in XXX_GW_abstractions_Locations.xml
        2. paste into column H,I,J,K (starting at row 3)
        3. copy the parent locations (id, x,y,z) as listed in XXX_GW_abstractions_Locations_MultiLayer.xml
        4. paste into column B,C,D,E (starting at row 3)

If you do have an XML-editor which can only copy-paste the table with XML-structure, it might be wise to create a macro in your text editor which converts the table into a comma seperated table which can be loaded into Excel.

        1. check that the format of z coordinatecomment the shut down activity in the GA run out
        2. run the
    model
  1. execute the xxx_prepare but in the modules directory
  2.  
        1. macro create_xml