scrollbar |
---|
Display the details of the selected task
The various details are described below:
Item | Details | ||
---|---|---|---|
Task ID | An identifier for the Task. Displayed in the header. | ||
Task Status | As described for the main forecast screen | Available Actions | As described for the main forecast screen |
Description | Text description associated with the task. | ||
Tag | An identifier used for Event/Action mappings (see: Setting Up Event-Action Configuration. Only displayed if set. | ||
Workflow ID | An identifier for the associated Workflow. | ||
What-if Scenario | An identifier for the associated What-if Scenario | ||
Owning MC ID | MC the task belongs to | ||
Start Time | The first forecast run is done at the Start time | ||
End Time | Scheduling of the task stops at the End Time | ||
IntervalRepeat Mode | The time interval at which the scheduled task should run | ||
Shift T0 | Allows to define a period of time over which the T0 of the forecast itself should be set back in relation to the Start time of the forecast run. | ||
Forecast Length | Optional element for overruling the pre-defined forecast length. N.B. if an end time is specified in the timeseriesSet, it needs to be made overrulable in order for this forecast length option to have effect | ||
Expiry Time | Allows to set the expiry time of data produced by taskruns. Default is to take the runExpiry time of the workflow. If this is not defined, the expiry time configured on the MC is the default. | ||
Ensemble partitioning | Allows workflows to be split up run in parallel on multiple Forecasting Shells (e.g. for ensembles). This needs the attribute maxEnsembleParts in the Workflowdescriptor to be set to a value > 1. The value entered is the number of parallel parts the task should be split into. | ||
Task Priority | Tasks can have priority High or Normal. | ||
Failover behaviour | Whether this task should be run on the Failover Master Controller. | ||
Approve | Makes the forecast automatically current after it has been completed. Note that with the default synchProfiles, synchronisation will only download forecast data that are made current (i.e. that are approved) to the OC. | ||
Run Option | Selected Run Option. All, All One At A Time or All Most Recent Only | ||
Task XMLProperties | Link to download a copy of the properties of the tasks in xml format conforming to the taskList.xsd schema |