Comment: Migrated to Confluence 4.0

Construction Freshmaker

In november 2012, Bos Grijpskerke constrcuted the horizontal wells placed through directional drilling. The photos show (1) the removal of the borehole and (2) the filters that are inserted in the borehole. Two filters of 70 m will be installed