The user have to add a surface line from waterside, channelside of the embankment to the Dike top at the polder side
The 5 characteristics point are obligated in the right order!!!
- Bottom river channel
- Insert river channel
- Dike toe at river
- Dike top at river
- Dike top at polder
The description of these parameters can be found on the page Input parameters.