You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

The user have to add a surface line from waterside, channelside of the embankment to the Dike top at the polder side

 

 

The 5 characteristics point are obligated in the right order!!!

  1. Bottom river channel
  2. Insert river channel
  3. Dike toe at river
  4. Dike top at river
  5. Dike top at polder

 

 

 

The description of these parameters can be found on the page Input parameters.


 

  • No labels