Table of contents
OpenMI standard - version for reviewing
The candidate for the OpenMI Version 2.0 is opened for the review. Review started 23.12.2009 and will be finished 31.302010.
Content of the review
Following documents and material are prepared for the review
- What's new in OpenMI 2.0
- OpenMI 'in a nutshell
- Scope document
- The OpenMI Standard2 interface specification
- Migrating models
- How to
How to download the most recent source code
How to get started with OpenMI 2.x and Java
How to turn an ASCII file reader into a Linkable Component 2.0
How to link models with different grids (spatial mapping) - Source codes
- Standards in C# and Java
- Uni tests
- GUI including Tutorials
- SDK
- Source codes for the How to
- Examples
Reviewers
Anyone can participate in the reviewing process. Different type on the participation can be taken
I know nothing about OpenMI
If you like to obtain basic ideas about OpenMI See OpenMI 'in a nutshell Scope document and go to the OpenMI association page
I am using OpenMI 1.4 and like to know what is prepared for 2.0
See What's new in OpenMI 2.0
I like to do the review based on documentation
Download all documents
I like to play with the new version
See How to and download all documentation and source code. You can compile examples, standard GUI.. Based on the tutorials you can run prepared compositions.
Feedback
Is you like, you can provide the feedback to the Standard, documentation and other components. The simplest way is to place your feedback to the Feedback pages. You can place there your comments or ideas, comment already existing contributions. If you like support some ideas - you can vote for them.
The way, how to vote you can find ....
If you like to send more complex document, please send it directly to some member of OATC and we will place it on the News page
Survey
See OpenMI 2.0 Survey to review new changes of OpenMI 2.0
Changes during review process
Members of the OATC will continue in some changes to the documentation eventually GUI, new Examples and SDK implementation. Standard will not be changed during review period. Information about changes you can find on the page NewsReview Process - NEWS
Evaluation of the Review process
Review process will be evaluated in the April 2010. Result of the evaluation and the selected changes to be included in the final version of the Standard will be placed on the Review pages.
Have a nice Christmas - OATC development team