It must be noted that installing a larger pumping station is in general not sufficient as the hydraulic capacity of the stormwater drainage system that leads the runoff towards the pumping station must be increased as well. Thus, any plans made with the AST CRCTool should be considered approximations until engineers and planners can assess the effectiveness of conveyance to the pump station.

...

Cool spots are areas where people like to be on hot days. Metric for heat stress reduction is the number of cool areas that is created in a project area by applying adaptation measures. 
To qualify as a cool spot, adaptation measures should be over 200 m2 and have a significant cooling effect.

Measures that have a significant cooling effect are: 

...

If the available total reconstruction budget is known this figure can be used as a ‘target value’ in the sense that this budget should not be exceeded. Construction cost estimates of the AST CRCTool show considerable uncertainty because these estimates are based on generic unit cost prices and local conditions in the project area are not taken into consideration, if at all known. Moreover, costs often increase when making detailed and final designs due to the fact that extra functionalities are added to the first conceptual designs that are made during our workshops. In order to take this into consideration it is our recommendation to use only 60 – 75 % of the available reconstruction budget as target value in the ASTCRCTool.

Later on, in the planning session attention could be paid to the distribution of construction costs (and benefits) over the stakeholders, being both public authorities and private land and property owners.

...

If the available annual maintenance budget is known this figure can be used as a ‘target value’ in the sense that this budget should not be exceeded. Maintenance cost estimates of the AST CRCTool show considerable uncertainty, because these estimates are based on generic unit cost prices; moreover, local conditions in the project area are not taken into consideration, if at all known. In order to take this uncertainty into consideration it is our recommendation to use only 60 – 75 % of the available maintenance budget as target value in the ASTCRCTool.

As with a fair distribution of construction costs, attention should be paid to the distribution of maintenance costs over the stakeholders, during the planning of adaptation measures.