Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migration of unmigrated content due to installation of a new plugin
h2. Summary Pre
scrollbar

Summary

Pre condition:

...

The

...

user

...

has

...

two

...

schematizations

...

  • a

...

  • InfoWorks

...

  • CS

...

  • schematization

...

  • for

...

  • Mexico

...

  • city

...

  • that

...

  • offers

...

  • flow,

...

  • water

...

  • level

...

  • in

...

  • 100000

...

  • locations

...

  • and

...

  • accepts

...

  • flow

...

  • and

...

  • water

...

  • level

...

  • in

...

  • 20000

...

  • locations.

...

  • Each

...

  • quantity

...

  • offered

...

  • can

...

  • be

...

  • modified

...

  • by

...

  • two

...

  • operations.

...

  • a

...

  • MIKE

...

  • 11

...

  • schematization

...

  • for

...

  • the

...

  • Rio

...

  • Grande

...

  • river

...

  • system

...

  • that

...

  • offers

...

  • flow,

...

  • water

...

  • level,

...

  • velocity,

...

  • flow

...

  • area

...

  • and

...

  • flow

...

  • with

...

  • in

...

  • 50000

...

  • locations

...

  • and

...

  • accepts

...

  • inflow

...

  • in

...

  • 50000

...

  • locations.

...

  • Each

...

  • quantity

...

  • offered

...

  • can

...

  • be

...

  • modified

...

  • by

...

  • two

...

  • operations.

...

Target:

...

The

...

user

...

wants

...

to

...

create

...

a

...

linked

...

configuration

...

where

...

the

...

two

...

models

...

are

...

bi-directionally

...

linked

...

in

...

4

...

locations.

...

Succes

...

criterea:

...

User

...

creates

...

the

...

configuration

...

with

...

8

...

links

...

in

...

total

...

in

...

less

...

than

...

2

...

minutes.

...

Steps:

...

1)

...

Start

...

OmiEd

...


2)

...

Add

...

model

...

"InfoWorks,

...

Mexico

...

City"

...


3)

...

Add

...

model

...

"MIKE

...

11,

...

Rio

...

Grande"

...


4)

...

Add

...

link

...

(InfoWorks,

...

Flow,

...

Location

...

1,

...

linear

...

tranformation

...

-1*x

...

+

...

0)

...

->

...

(MIKE

...

11,

...

Inflow,

...

Location

...

1)

...


5)

...

Add

...

link

...

(MIKE

...

11,

...

Water

...

Level,

...

Location

...

1,

...

linear

...

transformation

...

x-10)

...

->

...

(InfoWorks,

...

Stage,

...

Location

...

1)

...


6-11)

...

Repeat

...

4-5

...

for

...

Location

...

2,

...

Location

...

3,

...

Location

...

4.

...


12)

...

Save

...

the

...

configuration

...

How

...

to

...

address

...

in

...

Version

...

1

...

Step

...

4)

...

Choosing

...

Add

...

link

...

will populate the link dialog. This will propulate two tree-views.

  • On left-handside the output exchange item list contains 400000 (InfoWorks) elements (2 quantities * 100000 locations * 2 operations).
  • On the right handside the input exchange item list contains 50000 (MIKE 11) elements (1 quantity * 50000 locations)
    After the population of the lists the user have to pick 1 out of 400000 and 1 out of 50000.

Step 5) Choosing Add link will populate the link dialog. This will propulate two tree-views.

  • On left-handside the output exchange item list contains 500000 (MIKE 11) elements (5 quantities * 50000 locations * 2 operations).
  • On the right handside the input exchange item list contains 40000 (InfoWorks) elements (2 quantity * 20000 locations)
    After the population of the lists the user have to pick 1 out of 500000 and 1 out of 40000.

Drawbacks

After step 11) OmiEd will have poulated (400000 + 50000 + 500000 + 40000)*4 = 3960000 treview elements and MIKE 11 and InfoWorks will together have generated all these.

Hardly doable in 2 minutes?

How to address in Version 2

Present ideas in any form how you'd expect it to work in the OpenMI 2.0

populate _Describe how you'd approach above mentioned use case in terms of OpenMI 1.0. Example source code can be listed using \{code\} macro._ h3. Drawbacks _List all possible problems that you may expect in version 1.x of OpenMI._ h2. How to address in Version 2 _Present ideas in any form how you'd expect it to work in the OpenMI 2.0_
scrollbar