Agenda for Piled Embankment - Related Activities by Deltares and Partners

  16:15 session D2: Three paper presentations at ECSMGE24 in Lisbon, Portugal:

...

  • Piled Embankments with Basal Steel Reinforcement (PEBSTER), with partners TU Darmstadt, Institute of Geotechnics, Keller, and SHM Systems. PEBSTER is a GEOLAB transnational project and a TKI project.
  • Groundwater in geotextile embankments, with partner Solmax-TenCate. This is  a TKI project, funded by a TKI-PPS funding of the Dutch Ministry of Economic Affairs.

Interested in a collaboration?

  • Currently, we are working on a new research project with a large test set-up and a simulation of train passages. Interested to join our research consortium? Contact us. We expect a financial contribution.Groundwater in geotextile embankments, with partner Solmax-TenCate. This is  a TKI project, funded by a TKI-PPS funding of the Dutch Ministry of Economic Affairs.
  • Deltares frequently opens the doors of its experimental facilities to support innovative initiatives from Dutch start-ups and SMEs (small and medium-sized enterprises), enhancing interaction with these businesses. With the SME challenge, Deltares is offering free access to the Hydro and Geo facilities and laboratories to test design concepts of innovations. A second 2024 round will be done in the autumn of 2024, and registration is already possible.
  • Any other ideas to collaborate? Contact Suzanne van Eekelen

Design Guideline Basal Reinforced Piled Embankments

...

A basal-reinforced pile-supported embankment can be used for the construction of a road, railway or an industrial area when a traditional construction method would require too much construction time, affect vulnerable objects nearby or give too much residual settlement, making frequent maintenance necessary.

  •  

Image Modified

 
 
Construction of the N210 in the Krimpenerwaard: sensitive existing road, very soft soil; Ballast Nedam Infra and Huesker Geosynthetics

...