Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migration of unmigrated content due to installation of a new plugin
h2. Summary Pre
scrollbar

Summary

Pre condition:

...

The

...

user

...

has

...

two

...

schematizations

...

  • a

...

  • InfoWorks

...

  • CS

...

  • schematization

...

  • for

...

  • Mexico

...

  • city

...

  • that

...

  • offers

...

  • flow,

...

  • water

...

  • level

...

  • in

...

  • 100000

...

  • locations

...

  • and

...

  • accepts

...

  • flow

...

  • and

...

  • water

...

  • level

...

  • in

...

  • 20000

...

  • locations.

...

  • Each

...

  • quantity

...

  • offered

...

  • can

...

  • be

...

  • modified

...

  • by

...

  • two

...

  • operations.

...

  • a

...

  • MIKE

...

  • 11

...

  • schematization

...

  • for

...

  • the

...

  • Rio

...

  • Grande

...

  • river

...

  • system

...

  • that

...

  • offers

...

  • flow,

...

  • water

...

  • level,

...

  • velocity,

...

  • flow

...

  • area

...

  • and

...

  • flow

...

  • with

...

  • in

...

  • 50000

...

  • locations

...

  • and

...

  • accepts

...

  • inflow

...

  • in

...

  • 50000

...

  • locations.

...

  • Each

...

  • quantity

...

  • offered

...

  • can

...

  • be

...

  • modified

...

  • by

...

  • two

...

  • operations.

...

Target:

...

The

...

user

...

wants

...

to

...

create

...

a

...

linked

...

configuration

...

where

...

the

...

two

...

models

...

are

...

bi-directionally

...

linked

...

in

...

4

...

locations.

...

Succes

...

criterea:

...

User

...

creates

...

the

...

configuration

...

with

...

8

...

links

...

in

...

total

...

in

...

less

...

than

...

2

...

minutes.

...

Steps:

...

1)

...

Start

...

OmiEd

...


2)

...

Add

...

model

...

"InfoWorks,

...

Mexico

...

City"

...


3)

...

Add

...

model

...

"MIKE

...

11,

...

Rio

...

Grande"

...


4)

...

Add

...

link

...

(InfoWorks,

...

Flow,

...

Location

...

1,

...

linear

...

tranformation

...

-1*x

...

+

...

0)

...

->

...

(MIKE

...

11,

...

Inflow,

...

Location

...

1)

...


5)

...

Add

...

link

...

(MIKE

...

11,

...

Water

...

Level,

...

Location

...

1,

...

linear

...

transformation

...

x-10)

...

->

...

(InfoWorks,

...

Stage,

...

Location

...

1)

...


6-11)

...

Repeat

...

4-5

...

for

...

Location

...

2,

...

Location

...

3,

...

Location

...

4.

...


12)

...

Save

...

the

...

configuration

...

How

...

to

...

address

...

in

...

Version

...

1

...

Step

...

4)

...

Choosing

...

Add

...

link

...

will

...

populate

...

the

...

link

...

dialog.

...

This

...

will

...

propulate

...

two

...

tree-views.

...

  • On

...

  • left-handside

...

  • the

...

  • output

...

  • exchange

...

  • item

...

  • list

...

  • contains

...

  • 400000

...

  • (InfoWorks)

...

  • elements

...

  • (2

...

  • quantities

...

  • *

...

  • 100000

...

  • locations

...

  • *

...

  • 2

...

  • operations).

...

  • On

...

  • the

...

  • right

...

  • handside

...

  • the

...

  • input

...

  • exchange

...

  • item

...

  • list

...

  • contains

...

  • 50000

...

  • (MIKE

...

  • 11)

...

  • elements

...

  • (1

...

  • quantity

...

  • *

...

  • 50000

...

  • locations)

...


  • After

...

  • the

...

  • population

...

  • of

...

  • the

...

  • lists

...

  • the

...

  • user

...

  • have

...

  • to

...

  • pick

...

  • 1

...

  • out

...

  • of

...

  • 400000

...

  • and

...

  • 1

...

  • out

...

  • of

...

  • 50000.

...

Step 5)

...

Choosing

...

Add

...

link

...

will

...

populate

...

the

...

link

...

dialog.

...

This

...

will

...

propulate

...

two

...

tree-views.

...

  • On

...

  • left-handside

...

  • the

...

  • output

...

  • exchange

...

  • item

...

  • list

...

  • contains

...

  • 500000

...

  • (MIKE

...

  • 11)

...

  • elements

...

  • (5

...

  • quantities

...

  • *

...

  • 50000

...

  • locations

...

  • *

...

  • 2

...

  • operations).

...

  • On

...

  • the

...

  • right

...

  • handside

...

  • the

...

  • input

...

  • exchange

...

  • item

...

  • list

...

  • contains

...

  • 40000

...

  • (InfoWorks)

...

  • elements

...

  • (2

...

  • quantity

...

  • *

...

  • 20000

...

  • locations)

...


  • After

...

  • the

...

  • population

...

  • of

...

  • the

...

  • lists

...

  • the

...

  • user

...

  • have

...

  • to

...

  • pick

...

  • 1

...

  • out

...

  • of

...

  • 500000

...

  • and

...

  • 1

...

  • out

...

  • of 40000.

Drawbacks

After step 11) OmiEd will have poulated (400000 + 50000 + 500000 + 40000)*4 = 3960000 treview elements and MIKE 11 and InfoWorks will together have generated all these.

Hardly doable in 2 minutes?

How to address in Version 2

Present ideas in any form how you'd expect it to work in the OpenMI 2.0

40000. _Describe how you'd approach above mentioned use case in terms of OpenMI 1.0. Example source code can be listed using \{code\} macro._ h3. Drawbacks _List all possible problems that you may expect in version 1.x of OpenMI._ h2. How to address in Version 2 _Present ideas in any form how you'd expect it to work in the OpenMI 2.0_
scrollbar