This guide will

...

explain the use of the Adaptation Support Tool 2.0

...

going through the initial setup and configuration step by step. 

First, read, discuss and accept the disclaimer and copyrights. All participants have to understand and agree that the results of the AST are merely indicative and cannot be used for final design and decision making. After accepting the disclaimer and copyrights we can make

...

start

...

using the tool.

Figure 1. Disclaimer and copyright screen 


To begin using the AST, select Start a new project or, in case you already have a project select Open existing project.

...

Figure 2. Starting/Opening a project

Map manipulation

The map mapview can be manipulated changed with several buttons , that are divided depending on with regards to their functions into: map controls, drawing controls and layers and legend.

Figure 3. Manipulation of the AST map

...

Layers

 Layers selection button

When this button is pressedselected, several layers can be chosen to be shown in the map, as similar to the layers provided below.

Figure 4. Layers of the AST

Legend

 Legend button

When the legend ‘legend’-button is selected , the legend of the active layers activated can be observedvisualized, as shown in the image below.

Figure 5. Legend

Set up

After accepting the disclaimer and copyrights and starting and project, search Search for the area where you want to make the project after accepting both the disclaimer and copyrights, and starting the project.

Figure 6. Search for a project location


The tool will go to the location selected. Afterwards, draw the area of the measurepan and zoom into the selected location. Additionally, draw an area to indicate the project area:

Figure 7. Drawing of the project area


Once the area is drawn, the AST will give the total area of the measurea NEXT button will to appear to continue with the project area setup.

Figure 8. Output after drawing the project area


Press next “NEXT” to continue and fill in out all the “project area”parametersthe parameters of the project area. Notice that until all the parameters are not filled in it is not possible to continue you won’t be able to go to the next step until you have filled out all the parameters.

Figure 9. "Project area" parameters


Once all

...

the parameters of the project area have been filled

...

, press DONE to continue. Thereafter, draw the

...

(spatial) outline of the measure into the map. This

...

can be a polygon, a line or a point measure.

After drawing the outline of the measure, you can give it a name in “Area

...

name” and click CHOOSE MEASURE to choose the measure

...

that you wish to apply to the area.

Figure 10. Area name


After selecting CHOOSE MEASURE, a list with of all the measures will appear, as seen shown in the image below:

Figure 11. List of measures in the AST

 

The listed measures have values which are their ranking ranked according to the “project area” parameters previously selectedtheir effectiveness based on the properties of the project area and the climate adaptation goal within the project area.

 

Figure 12. Measure ranking of a measure


In the list with the measures, it is also possible to observed icons, which indicate the climate effect those measures have:The icons as listed below indicate to what climate effect the measures contribute.

In order to have more information on a certain measure, click LEARN MORE. When clicking LEARN MORE, both the

...

effect on climate change and a short description

...

plus image will be shown.

Figure 13. Example of the content of LEARN MORE of a measureIf that measure is of your interest, select it by clicking CHOOSE. Then a

 

Select CHOOSE if you want to use the measure in your project. A screen to choose the measure depth, its inflow area as well as its radius and width will appear next. Notice that depending on the kind of measure (polygon, linear or point)

...

some of those options will not appear.

Figure 14. Parameter ranges that  can be chosen for a measureNotice that the predefined

 

The values for

...

depth, inflow

...

area,

...

width and radius are default values typical for the chosen measure. Please be aware that the “Measure depth” refers to the depth of the layer of water that can be stored in the facility

...

and not the depth of the actual measure itself. 

Once those parameters are

...

completed, press DONE. The measure will appear in the map

...

and it can be deactivated any time by clicking on the red toggles.

 

Figure 15. Output after choosing a measure

Scenario metrics

On the right side of the map, the results of applying the measure can be applied measures are visualized. Those results These are divided into the results with regards to climate adaptation, water quality and cost resultscosts. 

The results can be visualized both graphically as well as numerically.

Figure 16. Final screen of the AST with the results

...

Saving and exporting results

In order to save and export a project, please click on the menu at the upper left corner of the screen.

Figure 18. Indication with a red square of the button that needs to be pressed to save or export projects

 

Once this button is

...

selected, a menu will be

...

showing

...

options to save or export the project, to see project settings, but also opening a new project.   

Figure 19. Menu to save and export projects

 

·         To save a project

...

click on the tab “Save project”. The project will be saved in the default download folder of the browser. This can be on the local machine or an attached network drive. In other words not in the cloud.

·         To export a project, press on the tab “Export project”. The

...

options of exporting the project in a CSV (Comma Separated File) and GEOJSON formats will be provided.

Project settings

Project settings can be easily accessed easily by clicking in the upper right button on the screen.

Figure 20. Indication with a red square of the button that needs to be pressed to access the Project settingsIn


It is possible to adjust the parameters of the project

...

within the settings of the project area.

The adaptation targets can be set in the PROJECT TARGET tab. Here desired adaptation targets (KPI’s) for the project area can be set and the relevant (KPI’s) to be shown in the Results tab can be selected. The project targets are divided into the same indicators as the ones in the results (climate, water quality and cost).

Figure 21. Project target in the project settings