This section uses tests performed by hand or by means of an Excel spreadsheet.

3.1 Test of all possible trajectories of the Global check and the Overall result

Description

This benchmark tests all possible trajectories according to the Global check and all possible combinations between the Global and the Detailed checks: 

CaseStep 1aStep 1cStep 1dStep 1e
Average slope

Step 1e

Breach flow

Step 1eGlobal checkDetailed checkOverall result Warning message(s)Information message 
ANo     PassPassWarning(D50 < 200 μm)a 
BYesYes    FailFailFail Artificial foreland, Advanced check needed
CYesNoYes   FailPassFail(steepest slope over 5 m)b 
DYesNoNoYesNoYesFailPassPass  
EYesNoNoYesYesYes FailPassWarning

(D50 < 200 μm)a 

(Very fine sand)c

 
FYesNoNoNoYesYesFailFailFail 

(D50 < 200 μm)a 

(Very fine sand)c

 
GYesNoNoNoNoNoPassPassPass  
HYesNoNoNoNoNoPassFailWarning(Illogical result)d 
IYesNoNoNoNoNoPassNot availablePass  
JYesNoNoYesNoYesFailNot availableNot available  

 

a  D50 < 200 μm in the Detailed check, Advanced check needed.

b  The criteria on "steepest slope over 5 m" is met, Advanced check needed.

c  The selected sand type is "Very fine" so the breach flow check in step 1e could not be performed, Advanced check needed.

d  Global passes but Detailed fails, check the input.

 

 

For case A, the same input as benchmark 1-1 (see group 1)  is used except:

  • for the distribution of the stochastic parameters of the Detailed check (LogNormal instead of Deterministic/Normal)
  • for the surface line (the length of the foreland is increased to 160 m instead of 60 m)
  • a "Distance influence zone" of 10 m is used.

 

For case B, the same input as benchmark 1-1 (see group 1) is used except:

  • for the distribution of the stochastic parameters of the Detailed check (LogNormal instead of Deterministic/Normal)
  • for the foreland: an artificial instead of a natural foreland is assumed.

 

For case C, the same input as benchmark 1-1 (see group 1) is used except:

  • for the distribution of the stochastic parameters of the Detailed check (LogNormal instead of Deterministic/Normal)
  • for the position of the characteristic point "Insert river channel" which is lowered to get a slope channel of 1 : 7,1.

 

For case D, the same input as benchmark 1-1 (see group 1) is used except:

  • for the distribution of the stochastic parameters of the Detailed check (LogNormal instead of Deterministic/Normal)
  • for the grain diameters:
    • for Calais sand : D50 = 230 μm  (instead of 180) and D15 = 130 μm (unchanged)
    • for Compacted sand : D50 = 210 μm (instead of 160) and D15 = 110 μm (unchanged)

 

For case E, the same input as benchmark 1-1 (see group 1) is used except:

  • for the distribution of the stochastic parameters of the Detailed check (LogNormal instead of Deterministic/Normal)
  • for the channel slope which is 1 : 5 instead of 1 : 6

 

For case F, the same input as benchmark 1-1 (see group 1) is used except:

  • for the distribution of the stochastic parameters of the Detailed check (LogNormal instead of Deterministic/Normal)
  • for the channel slope which is 1 : 7.1 instead of 1 : 6.

 

For case G, the same input as benchmark 1-1 (see group 1) is used except:

  • for the distribution of the stochastic parameters of the Detailed check (LogNormal instead of Deterministic/Normal)
  • for the channel slope which is 1 : 7.1 instead of 1 : 6.
  • for the grain diameters:
    • for Calais sand : D50 = 230 μm  (instead of 180) and D15 = 130 μm (unchanged)
    • for Compacted sand : D50 = 210 μm (instead of 160) and D15 = 110 μm (unchanged)

 

For case H, the same input as benchmark 1-1 (see group 1) is used except:

    • for the distribution of the stochastic parameters of the Detailed check (LogNormal instead of Deterministic/Normal)
    • for the state parameter which is equal to -0.06 instead of -0.03
    • for the grain diameters:
      • for Calais sand : D50 = 230 μm  (instead of 180) and D15 = 130 μm (unchanged)
      • for Compacted sand : D50 = 210 μm (instead of 160) and D15 = 110 μm (unchanged)
    • for the Detailed check, the required probability of failure is 1 per 40000 years instead of 1 per 4000 years and the migration velocity is 0.5m/year instead of 10 mm /year.

 

For case I, the same input as case H is used except that the Detailed check is not performed.

 

For case J, the same input as case D is used except that the Detailed check is not performed.

 

Benchmarks results

For each cases, the Global and Detailed checks are worked out in an Excel spreadsheet.

Hereafter, the main results are given per case,

NOTE: For the Detailed check, the reliability index (β) can't be easily calculated by an analytical solution, as the four stochastics (cotan(β), cotan(γ), D/H and c) have a LogNormal distribution. Therefore, the value of the reliability index (β) calculated by D-Flow Slide (using a FORM analysis, invoked from a probabilistic library largely tested) is used in the spreadsheet.

Case A:

Global check - Step 1a:

Channel depth: H = 15 m
Marge = 2 H  = 30 m

Slope of the observation profile: 1:15
Assessment level: Z = -10 m
XSsign = 80 m
XSzv = 30 m

XSsign > XSzv => Flow slide would not lead to damage on levee => Global check passes.

Detailed check: (see table below for intermediary results) Probability of flood damage by liquefaction  (= 0.00) < Allowable probability of failure (2.50 × 10-6) => Detailed check passes.

Overall check: as Global and Detailed check pass, the Overall check gives a Warning message because D50 < 200 μm , an Advanced check is therefore needed. 

Case B:

Global check - Step 1a

Channel depth: H = 15 m

Marge = 2 H  = 30 m

Slope of the observation profile: 1:15

Assessment level: Z = -10 m

XSsign (-10 m ) < XSzv (50 m) => Flow slide would lead to damage on levee => Go to step 1c.

Global check - Step 1c: The foreland is artificial => Global and Detailed check fail, an Advanced check is needed.

Detailed check: (see table below for intermediary results) Probability of flood damage by liquefaction  < Allowable probability of failure  => Detailed check passes.

Overall check: as step 1c of Global check fails, the Overall check fails whatever the Detailed check result. 

Case C:

Global check - Step 1a:

Channel depth: H = 14.008 m

Marge = 2 H  = 28.016 m

Slope of the observation profile: 1:15

Assessment level: Z = -10.331 m

XSsign (1.904 m) < XSzv (40.943 m) => Flow slide would lead to damage on levee => Go to step 1c.

Global check - Step 1c: The foreland is natural => Go to step 1d.

Global check - Step 1d: The average slope over a height of at least 5 m is 1:3.901 so steeper than 1:4 => Flow slide is possible based on criterium "steepest slope over 5 m" => Global check fails.

Detailed check: (see table below for intermediary results) Probability of flood damage by liquefaction  < Allowable probability of failure  => Detailed check passes.

Overall check: the Overall result gives a warning because the criteria on "steepest slope over 5 m" is met, an Advanced check is therefore needed.

Case D:

Global check - Step 1a:

Channel depth: H = 15 m

Marge = 2 H  = 30m

Slope of the observation profile: 1:15

Assessment level: Z = -10 m

XSsign (-10 m) < XSzv (50 m) => Flow slide would lead to damage on levee => Go to step 1c.

Global check - Step 1c: The foreland is natural => Go to step 1d.

Global check - Step 1d: The average slope over a height of at least 5 m is 1:6 so softer than 1:4 => Flow slide is not possible based on criterium "steepest slope over 5 m" => Go to step 1e.

Global check - Step 1e:

The slope channel is 1:6, so the slope is softer than the critical (local) slope from the CUR table (not too fine sand with  D50 = 230 μm and D15 = 130 μm) => Breaching is not possible.

But the total slope is 1:6 so steeper than 1:7 => Flow slide is possible based on average slope => Global check fails.

Detailed check: (see table below for intermediary results) Probability of flood damage by liquefaction  < Allowable probability of failure  => Detailed check passes.

Overall check: the Overall result passes.

Case E:

Global check - Step 1a:

Channel depth: H = 15 m

Marge = 2 H  = 30m

Slope of the observation profile: 1:15

Assessment level: Z = -10 m

XSsign (-70 m) < XSzv (30 m) => Flow slide would lead to damage on levee => Go to step 1c.

Global check - Step 1c: The foreland is natural => Go to step 1d.

Global check - Step 1d: The average slope over a height of at least 5 m is 1:5 so steeper than 1:4 => Flow slide is not possible based on criterium "steepest slope over 5 m" => Go to step 1e.

Global check - Step 1e:

D50 = 180 μm < 200  μm => Breaching is possible.

And the total slope is 1:5 so steeper than 1:7 => Flow slide is possible based on average slope => Global check fails.

Detailed check: (see table below for intermediary results) Probability of flood damage by liquefaction  < Allowable probability of failure  => Detailed check passes.

Overall check: the Overall check gives a Warning message because D50 < 200 μm , an Advanced check is therefore needed.

Case F:

Global check - Step 1a: Flow slide would lead to damage on levee => Go to step 1c.

Global check - Step 1c: The foreland is natural => Go to step 1d.

Global check - Step 1d: The average slope over a height of at least 5 m is 1:7.1 so softer than 1:4 => Flow slide is not possible based on criterium "steepest slope over 5 m" => Go to step 1e.

Global check - Step 1e:

D50 = 180 μm < 200  μm => Breaching is possible.

And the total slope is 1:7.1 so softer than 1:7

=> Flow slide is possible based on average slope => Global check fails.

Detailed check: (see table below for intermediary results) Probability of flood damage by liquefaction  < Allowable probability of failure  => Detailed check passes.

Overall check: as Detailed check passes, the Overall check gives a Warning message because D50 < 200 μm , an Advanced check is therefore needed. 

Case G:

Global check - Step 1a: Flow slide would lead to damage on levee => Go to step 1c.

Global check - Step 1c: The foreland is natural => Go to step 1d.

Global check - Step 1d: The average slope over a height of at least 5 m is 1:7.1 so softer than 1:4 => Flow slide is not possible based on criterium "steepest slope over 5 m" => Go to step 1e.

Global check - Step 1e:

The slope channel is 1:7.1, so the slope is softer than the critical (local) slope from the CUR table (not too fine sand with  D50 = 230 μm and D15 = 130 μm) => Breaching is not possible.

And the total slope is 1:7.1 so softer than 1:7

=> Flow slide is not possible based on average slope => Global check passes.

Detailed check: (see table below for intermediary results) Probability of flood damage by liquefaction  < Allowable probability of failure  => Detailed check passes.

Overall check: as Global and Detailed check pass, the Overall passes. 

 

Case H:

Global check - Step 1a: Flow slide would lead to damage on levee => Go to step 1c.

Global check - Step 1c: The foreland is natural => Go to step 1d.

Global check - Step 1d: The average slope over a height of at least 5 m is 1:7.1 so softer than 1:4 => Flow slide is not possible based on criterium "steepest slope over 5 m" => Go to step 1e.

Global check - Step 1e:

The slope channel is 1:7.1, so the slope is softer than the critical (local) slope from the CUR table (not too fine sand with  D50 = 230 μm and D15 = 130 μm) => Breaching is not possible.

And the total slope is 1:7.1 so softer than 1:7

=> Flow slide is not possible based on average slope => Global check passes.

Detailed check: (see table below for intermediary results) Probability of flood damage by liquefaction  > Allowable probability of failure  => Detailed check fails.

Overall check: Global passes and Detailed checks fails, that's not logical, so a warning message is displayed in the Overall check. 

 

Case I:

Global check : idem case H => Global check passes.

Detailed check: Results not available.

Overall check: the Global check passes and the Detailed check is not available. Therefore, the Overall check passes and no warning is given about illogical results.

 

Case J:

Global check : idem case B => Global check fails.

Detailed check: Results not available.

Overall check: the Global check fails and the Detailed check is not available. Therefore, the Overall result is not available, a detailed check is needed.

 

D-Flow Slide results

D-FLOW SLIDE results are in accordance with the results by hand as show in the tables below.

Results of benchmark 3-1 for case A:

 

Benchmark

D-FLOW SLIDE

Relative error

Step 1a:

Would flow slide lead to damage on levee?

Marge [m]

Slope [1:xxx]

Assessment level [m + NAP]

 

No

30.000

15.000

-10.000

 

No

30.000

15.000

-10.000

 

OK

0.00 %

0.00 %

0.00 %

Step 1c: Artificially underwater installed and non-compacted sandy foreshore?NoNoOK

Step 1d:

Flow slide possible based on criteria "steepest slope aver 5m" ?

Average slope over a height of at least 5 m [1:xxx]

 

No

6

 

No

6

 

OK

0.00 %

Step 1e:

Flow slide possible based on average geometry only?

Total inclination of the channel slope [1:xxx]

Is breaching possible?

 

Yes

6

Yes

 

Yes

6

Yes

 

OK

0.00 %

OK

Result of the Global check

Pass

Pass

OK

Fictive channel depth Hr [m]19.08719.087 0.00 %
Fictive slope cotan αr  [-]23.00023.000 0.00 % 
Max. allowable retrogression length Lallowable [m]150.000150.0000.00%
Probability of occurence P(ZV) [/km/year] 2.92 × 10-72.92 × 10-70.00 %
Reliability index critical length β-39.999 -
Probability P(L > Lallowable)0.000.000.00 %
Probability of flood damage by liquefaction P(falen|ZV) [/year]0.000.000.00 %
Allowable probability of failure [/year]2.50 × 10-6 2.50 × 10-60.00 %

Result of the Detailed check 

PassPassOK 
Overall resultWarningWarningOK 
 
Results of benchmark 3-1 for case B: 

 

Benchmark

D-FLOW SLIDE

Relative error

Step 1a:

Would flow slide lead to damage on levee?

Marge [m]

Slope [1:xxx]

Assessment level [m + NAP]

 

Yes

30.000

15.000

-10.000

 

Yes

30.000

15.000

-10.000

 

OK

0.00 %

0.00 %

0.00 %

Step 1c: Artificially underwater installed and non-compacted sandy foreshore?YesYesOK

Step 1d:

Flow slide possible based on criteria "steepest slope aver 5m" ?

Average slope over a height of at least 5 m [1:xxx]

 

No

6

 

No

6

 

OK

0.00 %

Step 1e:

Flow slide possible based on average geometry only?

Total inclination of the channel slope [1:xxx]

Is breaching possible?

 

Yes

6

Yes

 

Yes

6

Yes

 

OK

0.00 %

OK

Result of the Global check

Fail

Fail

OK

Fictive channel depth Hr [m]21.57121.5710.00 %
Fictive slope cotan αr10.510.50.00 % 
Max. allowable retrogression length Lallowable [m]60600.00 %
Probability of preventing a liquefaction P(ZV) [/km/year] 3.95 × 10-73.95 × 10-70.00 %
Reliability index β-1.712-
P(L > Lallowable)4.34 × 10-24.34 × 10-20.23 %
Probability of flood damage by liquefaction P(falen|ZV) [/year]1.72× 10-81.72 × 10-80.00 %
Allowable probability of failure [/year]2.50 × 10-6 2.50 × 10-60.00 %

Result of the Detailed check 

PassPassOK 
Overall resultFailFailOK
 
Results of benchmark 3-1 for case C:

 

Benchmark

D-FLOW SLIDE

Relative error

Step 1a:

Would flow slide lead to damage on levee?

Marge [m]

Slope [1:xxx]

Assessment level [m + NAP]

 

Yes

28.016

15.000

-10.331

 

Yes

28.016

15.000

-10.331

 

OK

0.00 %

0.00 %

0.00 %

Step 1c: Artificially underwater installed and non-compacted sandy foreshore?NoNoOK

Step 1d:

Flow slide possible based on criteria "steepest slope aver 5m" ?

Average slope over a height of at least 5 m [1:xxx]

 

Yes

3.901

 

Yes

3.901

 

OK

0.00 %

Step 1e:

Flow slide possible based on average geometry only?

Total inclination of the channel slope [1:xxx]

Is breaching possible?

 

Yes

7.395

Yes

 

Yes

7.395

Yes

 

OK

0.00 %

OK

Result of the Global check

Fail

Fail

OK

Fictive channel depth Hr [m]23.79123.7910.00 %
Fictive slope cotan αr8.4138.4130.00 % 
Max. allowable retrogression length Lallowable [m]60600.00 %
Probability of preventing a liquefaction P(ZV) [/km/year] 5.63 × 10-85.63 × 10-80.00 %
Reliability index β--1.334 -
P(L > Lallowable)9.09 × 10-19.09 × 10-10.00 % 
Probability of flood damage by liquefaction P(falen|ZV) [/year]5.12 × 10-85.12 × 10-80.00 %
Allowable probability of failure [/year]2.50 × 10-6 2.50 × 10-60.00 %

Result of the Detailed check 

PassPassOK
Overall resultWarningWarningOK
 
Results of benchmark 3-1 for case D: 

 

Benchmark

D-FLOW SLIDE

Relative error

Step 1a:

Would flow slide lead to damage on levee?

Marge [m]

Slope [1:xxx]

Assessment level [m + NAP]

 

Yes

30.000

15.000

-10.000

 

Yes

30.000

15.000

-10.000

 

OK

0.00 %

0.00 %

0.00 %

Step 1c: Artificially underwater installed and non-compacted sandy foreshore?NoNoOK

Step 1d:

Flow slide possible based on criteria "steepest slope aver 5m" ?

Average slope over a height of at least 5 m [1:xxx]

 

No

6

 

No

6

 

OK

0.00 %

Step 1e:

Flow slide possible based on average geometry only?

Total inclination of the channel slope [1:xxx]

Is breaching possible?

 

Yes

6

No

 

Yes

6

No

 

OK

0.00 %

OK

Result of the Global check

Fail

Fail

OK

Fictive channel depth Hr [m]21.57125.5710.00 %
Fictive slope cotan αr10.50010.5000.00 % 
Max. allowable retrogression length Lallowable [m]60600.00 %
Probability of preventing a liquefaction P(ZV) [/km/year] 3.92 × 10-73.92 × 10-70.00 %
Reliability index β-1.712 -
P(L > Lallowable)4.34 × 10-24.34 × 10-20.00 % 
Probability of flood damage by liquefaction P(falen|ZV) [/year]1.70 × 10-81.70 × 10-80.00 %
Allowable probability of failure [/year]2.50 × 10-6 2.50 × 10-60.00 %

Result of the Detailed check 

PassPassOK
Overall resultPassPassOK
 
Results of benchmark 3-1 for case E:

 

Benchmark

D-FLOW SLIDE

Relative error

Step 1a:

Would flow slide lead to damage on levee?

Marge [m]

Slope [1:xxx]

Assessment level [m + NAP]

 

Yes

30.000

15.000

-10.000

 

Yes

30.000

15.000

-10.000

 

OK

0.00 %

0.00 %

0.00 %

Step 1c: Artificially underwater installed and non-compacted sandy foreshore?NoNoOK

Step 1d:

Flow slide possible based on criteria "steepest slope aver 5m" ?

Average slope over a height of at least 5 m [1:xxx]

 

No

5.000

 

No

5.000

 

OK

0.00 %

Step 1e:

Flow slide possible based on average geometry only?

Total inclination of the channel slope [1:xxx]

Is breaching possible?

 

Yes

5.000

Yes

 

Yes

5.000

Yes

 

OK

0.00 %

OK

Result of the Global check

Fail

Fail

OK

Fictive channel depth Hr [m]25.14325.1430.00 %
Fictive slope cotan αr14140.00 % 
Max. allowable retrogression length Lallowable [m]60600.00 %
Probability of preventing a liquefaction P(ZV) [/km/year] 1.44 × 10-61.44 × 10-60.00 %
Reliability index β-0-
P(L > Lallowable)5.00 × 10-15.00 × 10-10.23 %
Probability of flood damage by liquefaction P(falen|ZV) [/year]7.18 × 10-7 7.18 × 10-70.18 %
Allowable probability of failure [/year]2.50 × 10-6 2.50 × 10-60.00 %

Result of the Detailed check 

Pass

Pass

OK 
Overall resultWarning

Warning

OK 

 

Results of benchmark 3-1 for case F:

 

Benchmark

D-FLOW SLIDE

Relative error

Step 1a:

Would flow slide lead to damage on levee?

Marge [m]

Slope [1:xxx]

Assessment level [m + NAP]

 

Yes

25.352

15.000

-10.775

 

Yes

25.352

15.000

-10.775

 

OK

0.00 %

0.00 %

0.00 %

Step 1c: Artificially underwater installed and non-compacted sandy foreshore?NoNoOK

Step 1d:

Flow slide possible based on criteria "steepest slope aver 5m" ?

Average slope over a height of at least 5 m [1:xxx]

 

No

7.099

 

No

7.100

 

OK

0.01 %

Step 1e:

Flow slide possible based on average geometry only?

Total inclination of the channel slope [1:xxx]

Is breaching possible?

 

Yes

7.100

Yes

 

Yes

7.100

Yes

 

OK

0.00 %

OK

Result of the Global check

Fail

Fail

OK

Fictive channel depth Hr [m]25.87425.8740.00 %
Fictive slope cotan αr6.6416.6410.00 % 
Max. allowable retrogression length Lallowable [m]60600.00 %
Probability of preventing a liquefaction P(ZV) [/km/year] 2.67 × 10-72.67 × 10-70.00 %
Reliability index β-0.974-
P(L > Lallowable)1.65 × 10-11.65 × 10-10.10 %
Probability of flood damage by liquefaction P(falen|ZV) [/year]4.40 × 10-8 4.40 × 10-80.00 %
Allowable probability of failure [/year]2.50 × 10-6 2.50 × 10-60.00 %

Result of the Detailed check 

PassPassOK 
Overall resultWarningWarningOK 

 

Results of benchmark 3-1 for case G:

 

Benchmark

D-FLOW SLIDE

Relative error

Step 1a:

Would flow slide lead to damage on levee?

Marge [m]

Slope [1:xxx]

Assessment level [m + NAP]

 

Yes

25.352

15.000

-10.775

 

Yes

25.352

15.000

-10.775

 

OK

0.00 %

0.00 %

0.00 %

Step 1c: Artificially underwater installed and non-compacted sandy foreshore?NoNoOK

Step 1d:

Flow slide possible based on criteria "steepest slope aver 5m" ?

Average slope over a height of at least 5 m [1:xxx]

 

No

7.099

 

No

7.100

 

OK

0.01 %

Step 1e:

Flow slide possible based on average geometry only?

Total inclination of the channel slope [1:xxx]

Is breaching possible?

 

No

7.100

No

 

No

7.100

No

 

OK

0.00 %

OK

Result of the Global check

Pass

Pass

OK

Fictive channel depth Hr [m]25.87425.8740.00 %
Fictive slope cotan αr6.6416.6410.00 % 
Max. allowable retrogression length Lallowable [m]60600.00 %
Probability of preventing a liquefaction P(ZV) [/km/year] 2.65 × 10-72.65 × 10-70.00 %
Reliability index β-0.974-
P(L > Lallowable)1.65 × 10-11.65 × 10-10.00 %
Probability of flood damage by liquefaction P(falen|ZV) [/year]4.38 × 10-84.38 × 10-80.00 %
Allowable probability of failure [/year]2.50 × 10-6 2.50 × 10-60.00 %

Result of the Detailed check 

Pass

Pass

OK 
Overall result

Pass

Pass

OK 

 

 

Results of benchmark 3-1 for case H:

 

Benchmark

D-FLOW SLIDE

Relative error

Step 1a:

Would flow slide lead to damage on levee?

Marge [m]

Slope [1:xxx]

Assessment level [m + NAP]

 

Yes

25.352

15.000

-10.775

 

Yes

25.352

15.000

-10.775

 

OK

0.00 %

0.00 %

0.00 %

Step 1c: Artificially underwater installed and non-compacted sandy foreshore?NoNoOK

Step 1d:

Flow slide possible based on criteria "steepest slope aver 5m" ?

Average slope over a height of at least 5 m [1:xxx]

 

No

7.099

 

No

7.100

 

OK

0.01 %

Step 1e:

Flow slide possible based on average geometry only?

Total inclination of the channel slope [1:xxx]

Is breaching possible?

 

No

7.100

No

 

No

7.100

No

 

OK

0.00 %

OK

Result of the Global check

Pass

Pass

OK

Fictive channel depth Hr [m]25.87425.8740.00 %
Fictive slope cotan αr6.6416.6410.00 % 
Max. allowable retrogression length Lallowable [m]60600.00 %
Probability of preventing a liquefaction P(ZV) [/km/year] 6.66 × 10-46.66 × 10-40.00 %
Reliability index β-0.974-
P(L > Lallowable)1.65 × 10-11.65 × 10-10.00 %
Probability of flood damage by liquefaction P(falen|ZV) [/year]1.10 × 10-41.10 × 10-40.00 %
Allowable probability of failure [/year]2.50 × 10-7 2.50 × 10-70.00 %

Result of the Detailed check 

FailFailOK 
Overall result

Warning

Warning

OK 

 

Results of benchmark 3-1 for case I:

 

Benchmark

D-FLOW SLIDE

Relative error

Step 1a:

Would flow slide lead to damage on levee?

Marge [m]

Slope [1:xxx]

Assessment level [m + NAP]

 

Yes

25.352

15.000

-10.775

 

Yes

25.352

15.000

-10.775

 

OK

0.00 %

0.00 %

0.00 %

Step 1c: Artificially underwater installed and non-compacted sandy foreshore?NoNoOK

Step 1d:

Flow slide possible based on criteria "steepest slope aver 5m" ?

Average slope over a height of at least 5 m [1:xxx]

 

No

7.099

 

No

7.100

 

OK

0.01 %

Step 1e:

Flow slide possible based on average geometry only?

Total inclination of the channel slope [1:xxx]

Is breaching possible?

 

No

7.100

No

 

No

7.100

No

 

OK

0.00 %

OK

Result of the Global check

Pass

Pass

OK

Result of the Detailed check 

Not availableNot availableOK 
Overall result

Pass

Pass

OK 

 

 

Results of benchmark 3-1 for case J: 

 

Benchmark

D-FLOW SLIDE

Relative error

Step 1a:

Would flow slide lead to damage on levee?

Marge [m]

Slope [1:xxx]

Assessment level [m + NAP]

 

Yes

30.000

15.000

-10.000

 

Yes

30.000

15.000

-10.000

 

OK

0.00 %

0.00 %

0.00 %

Step 1c: Artificially underwater installed and non-compacted sandy foreshore?YesYesOK

Step 1d:

Flow slide possible based on criteria "steepest slope aver 5m" ?

Average slope over a height of at least 5 m [1:xxx]

 

No

6

 

No

6

 

OK

0.00 %

Step 1e:

Flow slide possible based on average geometry only?

Total inclination of the channel slope [1:xxx]

Is breaching possible?

 

Yes

6

Yes

 

Yes

6

Yes

 

OK

0.00 %

OK

Result of the Global check

Fail

Fail

OK

Result of the Detailed check 

Not availableNot availableOK 
Overall resultFailFailOK

 

 

  • No labels