This screen allows the scheduling of a new task. A task is based upon a pre-defined workflow.
The details of the screen:
Item | Details |
---|---|
Description | Text description of the scheduled task |
Tag | An identifier used for Event/Action mappings (see: Setting Up Event-Action Configuration) |
WorkflowID | Drop down list, allows the selection of a pre-defined workflow. |
What-if Scenario | Drop down list, allows the selection of a pre-defined What-if Scenario. |
Start Time | The first task run is done at the Start time |
End Time | Scheduling of the task stops at the End Time |
Repeat Mode | Mode with several options, once only - add to queue in order to run the task immediately fixed interval - schedules tasks at fixed interval One or more times each day - schedules a task on fixed times each day one or more days each month - schedules a task a series of days per month to be selected, configurable options for timezone with daylightsaving can be used for this option |
Shift T0 | Allows to define a period of time over which the T0 of the forecast itself should be set back in relation to the Start time of the forecast run. |
Forecast length | Optional element for overruling the pre-defined forecast length. NB. if an end time is specified in the timeseriesSet, it needs to be made overrulable in order for this forecast length option to have effect |
Expiry Time | Allows to set the expiry time of data produced by taskruns. Default is to take the runExpiry time of the workflow. If this is not defined, the expiry time configured on the MC is the default. |
Ensemble partitioning | Allows workflows to be split up run in parallel on multiple Forecasting Shells (e.g. for ensembles). This needs the attribute maxEnsembleParts in the Workflowdescriptor to be set to a value > 1. The value entered is the number of parallel parts the task should be split into. |
Task Priority | Tasks can have priority High or Normal. |
Failover | Whether this task should be run on the Failover Master Controller. |
Approve Forecast | Ticking the approve box will set the status of the forecast automatically to current after it has been completed. |
Run Option | Mode with several options, All -No limitations on how many Forecasting Shells can run this workflow at the same time (default). All One At a Time - The Task will not be dispatched when there are TaskRuns with the same workflowId present. All Most Recent Only - If there are any taskRuns for this Task's workflowid already pending, those are cancelled first. |
The different repeat modes have specific configuration options:
Fixed Interval:
One or more times each day:
One or more days each month: