You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 27 Next »

Unknown macro: {import}

Introduction

The check on safety against liquefaction consists of passing through three phases, where the depth increases every time:

  • Simple check according to the recommandations of CUR-113
  • Global check according to the [Technic Report for Liquefaction|GEO:Literature^Technisch Rapport Voorland Zettingsvloeiing.doc] of Deltares, based on the VTV-2006
  • Detailed check, as described in the [Technic Report for Liquefaction|GEO:Literature^Technisch Rapport Voorland Zettingsvloeiing.doc]
  • Advanced check, using existing programs of Deltares:
    • SLIQ2D for liquefaction
    • HMBreach/HMTurb for breaching
  • No labels